If you are a micro or small enterprise with Udyam registration and a buyer has not paid within the agreed period, or within 45 days of accepting your goods or services at the most, you can file a claim before the Micro and Small Enterprises Facilitation Council. The Council first tries to settle the dispute and, if that fails, decides it as an arbitrator. The buyer owes compound interest at three times the RBI bank rate from the due date.

By Advocate B.K. SinghUpdated About 21 minutes to readTopic: Business, Corporate and Contracts

In short. Under sections 15 to 18 of the MSMED Act 2006, a buyer must pay a micro or small supplier within the agreed period, which cannot exceed 45 days from acceptance. Late payment attracts compound interest with monthly rests at three times the RBI bank rate. The supplier files a reference before the state Facilitation Council, now through the MSME ODR portal, which settles or arbitrates it.

This post is about one remedy: the claim a micro or small supplier makes before the Facilitation Council under Chapter V of the Micro, Small and Medium Enterprises Development Act 2006. It covers who qualifies, how the 45 days are counted, how interest is worked out, how the online filing and hearings run, what changed with the MSMED (Amendment) Act 2026, and what happens after the award. It is written for suppliers in Delhi, Noida, Ghaziabad and the rest of the NCR, and for buyers who have received a notice from a Council.

If you are still deciding between a Council claim, a commercial suit and an insolvency petition, our post on recovery options for unpaid invoices compares them side by side. For the wider commercial picture, see our corporate law practice page.

Law
MSMED Act 2006, sections 15 to 24 (amended 2026)
Who can file
Micro or small supplier with Udyam registration
Payment deadline
Agreed date, never more than 45 days from acceptance
Interest
Compound, monthly rests, three times the RBI bank rate
Forum
State MSE Facilitation Council, filed on the MSME ODR portal
Challenging an award
Section 34 petition; buyer deposits 75% first

What can an MSME supplier do when a buyer does not pay within 45 days?

You can make a reference to the Micro and Small Enterprises Facilitation Council of your state under section 18 of the MSMED Act, claiming the unpaid amount and statutory interest. The Council is a body set up by the state government, usually run from the Department of Industries or the Commissionerate of Industries. In Delhi it sits under the Government of NCT of Delhi; Uttar Pradesh and Haryana run regional councils, so a supplier in Noida or Ghaziabad files before the council that covers its district.

The reference is not a suit. You do not pay ad valorem court fee, you do not need a decree to start enforcement talks, and the buyer cannot escape to its own arbitration clause. The Council calls both sides, tries to bring about a settlement, and if that does not work, either arbitrates the dispute itself or sends it to an arbitration institution. Its award is enforceable like a court decree.

The remedy is strong because of three features that ordinary contract law does not give a supplier. Interest runs at a statutory rate that overrides whatever the purchase order says. The buyer cannot challenge the award without first depositing 75% of it. And the supplier chooses the forum near its own place of business, wherever the buyer is located.

Who can file before the MSE Facilitation Council?

Only a 'supplier' as defined in section 2(n) of the Act: a micro or small enterprise that has filed its memorandum under section 8, which today means Udyam registration. Medium enterprises are not suppliers for Chapter V, even though they are MSMEs for other purposes. The classification thresholds were raised from 1 April 2025: a micro enterprise has investment in plant and machinery or equipment up to ₹2.5 crore and turnover up to ₹10 crore, and a small enterprise up to ₹25 crore and ₹100 crore. Check your Udyam certificate, because the category shown there is what the Council will look at.

The timing of registration is the most argued point in these cases. In Silpi Industries v Kerala State Road Transport Corporation (2021) and Gujarat State Civil Supplies Corporation v Mahakali Foods (2022), the Supreme Court held that a supplier must be registered on the date of the contract, and that registering later does not cover earlier supplies. In NBCC (India) Ltd v State of West Bengal (January 2025), a two-judge bench doubted that view and referred the question to a larger bench. Until the larger bench decides, buyers will rely on Silpi and Mahakali, so a supplier that registered after the purchase order should expect this objection and get advice before filing.

Traders are a second grey area. Retail and wholesale traders were allowed to take Udyam registration in 2021 for priority sector lending, and buyers routinely argue that a trader cannot use section 18. Works contracts raise a similar fight, since buyers say a works contract is neither a supply of goods nor a service. These objections do not always succeed, but they add a round of hearings, and you should know about them before you choose the Council over a suit.

The buyer can be anyone who buys goods or receives services from the supplier for consideration: a private company, a partnership, a government department, a public sector undertaking, even another MSME. The buyer does not have to be in your state.

Does your claim fit the MSMED Act route?

General guidance. The documents and the facts of each case decide the outcome.

Your situationCouncil claim?What usually decides it
Micro or small manufacturer, registered before the order, buyer pays lateYesProof of delivery and acceptance, and the invoice dates
Service provider (IT, logistics, maintenance) with Udyam registrationYesProof the service was rendered and accepted
Registered only after the contract was signedDisputedSilpi and Mahakali against you; the pending NBCC reference may change this
Medium enterpriseNoUse a commercial suit, arbitration or the IBC
Trader registered on UdyamDisputedBuyers argue traders are outside Chapter V; take advice first
Works contract with a government departmentDisputedHow the contract is framed; courts have taken different views
Claim older than three years from the due dateConciliation only, in most casesLimitation bars the arbitration stage (Sonali Power, 2025)
Buyer rejected the goods in writing within 15 daysWeakWhether the objection was genuine and whether you cured it

The provisions that decide a delayed payment claim

Section 2(a) and 2(b), MSMED Act

Define the day of acceptance (actual delivery, or the day a written objection made within 15 days is removed) and the appointed day (the day after 15 days from acceptance or deemed acceptance). If the buyer raises no written objection within 15 days of delivery, acceptance is deemed on the day of delivery.

Section 15

The buyer must pay on the date agreed in writing or, if nothing is agreed, before the appointed day. A written agreement cannot fix a period longer than 45 days from acceptance. A purchase order that gives 90 days' credit does not stretch the statutory limit.

Section 16

If the buyer fails to pay in time, it owes compound interest with monthly rests at three times the bank rate notified by the RBI, from the appointed day or the agreed date. This applies notwithstanding any agreement or any other law, so a clause waiving interest does not bind the supplier.

Section 17 and 18

Section 17 makes the buyer liable for the principal with section 16 interest. Section 18 lets any party to the dispute make a reference to the Facilitation Council, which first attempts settlement and then arbitrates, applying the Arbitration and Conciliation Act 1996 as if there were an arbitration agreement.

Section 18A (inserted 2026)

Amounts due under a settlement or award can be recovered as arrears of land revenue through the Collector of the district where the buyer's assets are, and the amount is treated as a debt under the Insolvency and Bankruptcy Code.

Section 19

A buyer that applies to set aside an award or decree must first deposit 75% of the amount awarded. Under the 2026 amendment, if the challenge stays pending for more than six months, the court must direct that at least half the award be released to the supplier.

Sections 22, 23 and 24

The buyer must disclose unpaid MSE dues and interest in its annual accounts (s.22). Interest paid under the Act is not a deductible expense for the buyer (s.23). Sections 15 to 23 override any other law (s.24).

How are the 45 days counted?

From the day of acceptance, not from the invoice date. Acceptance is ordinarily the day the goods were delivered or the service was rendered. If the buyer objected in writing within 15 days of delivery, acceptance is the day the supplier removed the objection, for example by replacing the defective lot. If the buyer said nothing in writing within 15 days, acceptance is deemed to be the delivery date itself.

So the first thing to establish is the delivery date for each invoice. Signed delivery challans, lorry receipts, gate entry records, e-way bills, goods receipt notes generated by the buyer's ERP, service completion reports and acknowledgment emails all help. Where the order is a running supply, you will usually have dozens of invoices, each with its own due date, and interest is worked out invoice by invoice.

If there is a written agreement fixing a shorter credit period, say 30 days, payment is due on day 30. If the agreement gives more than 45 days, the agreed period is cut down to 45. If there is no written agreement on credit at all, the buyer must pay before the appointed day, which is the day after 15 days from acceptance. Many suppliers lose interest by assuming the 45 days always apply; where nothing was agreed in writing, the deadline is shorter.

How much interest can an MSME claim on delayed payment?

Compound interest with monthly rests at three times the bank rate notified by the Reserve Bank of India, from the due date until payment. The bank rate moves with the RBI's policy rates, so take the rate in force for each period from the RBI's notifications and apply it month by month. Your claim statement should show the working for every invoice: amount, delivery date, due date, payments received and the interest for each month.

Part payments are usually adjusted first against interest and then against principal, but Councils differ on this where the buyer's payments were made against specific invoices. Keep the buyer's remittance advices, because they show which invoices it claimed to be paying. Where the buyer deducted TDS or debited you for shortages, show those adjustments openly rather than leaving the Council to discover them.

Statutory interest is often larger than suppliers expect, and buyers know it. That is why many Council cases settle at the first or second hearing, with the buyer paying the principal and a negotiated part of the interest. Whether to accept such an offer is a commercial decision: a settlement now against a full award later, followed by a section 34 challenge and enforcement.

What changed with the MSMED (Amendment) Act 2026?

Parliament passed the MSMED (Amendment) Bill in August 2026, and the amending Act has been reported as brought into force on 13 August 2026. For delayed payment claims, the main changes are these: timelines inside section 18 (the settlement stage to finish within 90 days, the matter to go to arbitration within 30 days after that, and the award within 90 days of completion of pleadings); jurisdiction tied to the supplier's address recorded in its registration; recovery of awards as arrears of land revenue under new section 18A; and release of at least half the award to the supplier if a challenge is pending for more than six months.

Registration under section 8 becomes free and voluntary, and the old penalties for not registering go. But access to the Facilitation Council still depends on being a registered supplier, so registration remains the gateway to this remedy. Buyers that fail to disclose MSE dues in their accounts now face a warning, then a penalty, then a fine for repeat defaults.

The settlement stage itself is moving from conciliation by the Council to mediation under the Mediation Act 2023. How far that change is operational depends on notifications, and Councils may still be running the older procedure for some references. When your reference is registered, check which procedure the Council is applying and diarise its timelines accordingly. We describe the amendment here in general terms; for a live case, read the current text of section 18 and the Council's notice together.

Filing a delayed payment claim on the MSME ODR portal, step by step

Delayed payment references are now filed online. The MSME ODR portal went live in June 2025 and, from October 2025, new delayed payment cases are filed there rather than on the older Samadhaan system.

  1. Confirm your status and dates

    Download your Udyam certificate and check the category and the date of registration against the dates of the purchase orders. List every unpaid invoice with its delivery date and the date payment fell due. This list becomes the spine of the claim.

  2. Send a demand to the buyer

    A short legal notice or demand letter listing the invoices, the principal and the statutory interest is not compulsory, but it often produces payment and it fixes the buyer's stand. Ask the buyer to state in writing if it disputes any invoice and why.

  3. Register on the portal and file the reference

    Create a login with your Udyam number, enter the buyer's details (name, address, GSTIN, contact person), and upload the invoices, purchase orders, delivery proof and a statement of account. State the principal and the interest claimed, with the calculation attached.

  4. Serve and attend the settlement stage

    The Council issues notice to the buyer and fixes a hearing, often by video. Attend with someone who knows the account, because the first questions are usually about specific invoices, deductions and debit notes. Many cases settle here.

  5. Arbitration if settlement fails

    If the settlement attempt fails, the Council takes up arbitration itself or refers the case to an institution. You file a statement of claim with documents, the buyer files a reply and any counter-claim, and the Council hears arguments and may take evidence.

  6. Award, deposit and recovery

    The Council passes an award for principal and interest. If the buyer does not pay and does not challenge it with the 75% deposit, you enforce it as a decree under section 36 of the Arbitration Act or through the land revenue route under section 18A.

Keep a copy of every document exactly as uploaded, with page numbers. When the matter reaches arbitration or a section 34 court, everyone will refer to those pages.

Documents the Facilitation Council will ask for

Your status

  • Udyam registration certificate, with the date of registration
  • Earlier EM-II or UAM acknowledgment, if you were registered before Udyam
  • Company or firm documents and an authorisation in favour of the person filing
  • GST registration certificate

The contract

  • Purchase orders or work orders, with any amendments
  • Rate contract, supply agreement or tender documents
  • Emails or letters on the credit period and payment terms
  • Any written objection the buyer raised and your response

Supply and acceptance

  • Tax invoices and e-invoices
  • Delivery challans, lorry receipts, e-way bills
  • Goods receipt notes or inspection reports from the buyer
  • Service completion certificates or signed job sheets

Payments and the account

  • Ledger of the buyer's account in your books
  • Bank statements showing receipts
  • Remittance advices, TDS certificates and debit notes
  • Interest calculation, invoice by invoice
  • Demand notice and any reply from the buyer

What happens at the settlement hearing?

The Council, or a mediator, sits with both sides and goes through the account. The buyer's representative usually arrives with three points: some invoices were never received, some supplies were defective or short, and interest was never agreed. The supplier's job at this stage is to answer each point with paper. A goods receipt note signed by the buyer's stores answers the first point; the absence of any written objection within 15 days answers much of the second; section 16 answers the third.

A settlement here is recorded in writing and signed by both parties. It is binding and, after the 2026 amendment, can be recovered like an award. Make sure the settlement states the amount, the dates of payment, what happens on default (for example, that the full claim revives with interest) and that it settles only the invoices listed. Vague settlements that 'close all disputes' have cost suppliers claims they never meant to give up.

A point Advocate B.K. Singh often makes to supplier clients at this stage is that the settlement hearing is where the buyer's real defence first appears. Note it down carefully, because a buyer that says nothing about defects at conciliation and then produces a quality report in arbitration has a credibility problem the supplier can use.

When the Council becomes the arbitrator

If settlement fails, the Council can act as arbitrator itself, even though it attempted conciliation. The Supreme Court settled this in Mahakali Foods, which also held that Chapter V of the MSMED Act overrides an arbitration clause in the contract. So a buyer cannot insist on its own named arbitrator or its own seat once a valid section 18 reference is made. The Arbitration and Conciliation Act 1996 applies to the proceedings, including its rules on pleadings, evidence and interim measures.

The buyer can file a counter-claim, for example for liquidated damages for late delivery or for the cost of replacing defective goods, and the Council can decide it in the same proceedings. Suppliers should therefore check their own performance record before filing: late deliveries, rejected lots and pending warranty claims will all come up.

Arbitration before a Council is usually less formal than a private arbitration, but it is still a hearing on evidence. Affidavits of the person who handled the account, a clean statement of account and an interest calculation that the Council can check line by line make the difference. The award must give reasons. A bare award for 'the amount claimed' invites a challenge.

Is there a time limit for an MSME delayed payment claim?

For the arbitration stage, yes: the Limitation Act 1963 applies, which for a money claim on invoices generally means three years from the date payment fell due. In Sonali Power Equipments v Maharashtra State Electricity Board (2025), the Supreme Court held that the Limitation Act does not apply to the conciliation stage, so a time-barred claim can still be referred for settlement, but if settlement fails, the time bar will apply in arbitration.

Acknowledgments in writing extend limitation. A balance confirmation signed by the buyer, a letter admitting the dues, or an email asking for time to pay can each give you a fresh three years from its date, if made before the original period ran out. Whether the buyer's disclosure of MSE dues in its annual accounts under section 22 counts as an acknowledgment is decided case by case.

In practice, do not wait. Old claims are harder to prove because the buyer's staff change, delivery records go missing, and the buyer argues that silence for years shows the supplier accepted deductions. Our post on limitation periods for civil suits explains how acknowledgments and part payments work.

Defences buyers raise, and how they usually fare

  • 'The supplier was not registered when the order was placed.' A serious objection under Silpi and Mahakali, now under reference to a larger bench. Address it in the claim itself instead of waiting for the reply.
  • 'The goods were defective.' Weak if the buyer raised no written objection within 15 days and kept using the goods. Stronger where there are inspection reports, rejection notes and return challans from the time.
  • 'Payment was due only after our customer paid us.' Back-to-back payment clauses do not override section 15. The 45-day ceiling still applies.
  • 'Interest was never agreed, or was waived.' Section 16 applies notwithstanding any agreement, so a waiver clause in the purchase order does not bar statutory interest.
  • 'We have an arbitration clause.' Chapter V overrides it once a valid reference is made, as held in Mahakali Foods.
  • 'The claim is time-barred.' Fatal at the arbitration stage unless there is a written acknowledgment or part payment within time.
  • 'The supplier is a medium enterprise or a trader.' A medium enterprise is outside Chapter V; the trader point is contested and depends on what was supplied.

A made-up example: the Ghaziabad fabricator and the Gurugram buyer

Here's a made-up example. A small engineering unit in Loni Road Industrial Area, Ghaziabad, registered on Udyam in 2022 as a micro enterprise. In January 2026 it supplied fabricated panels worth ₹18 lakh to a manufacturing company in Gurugram against a purchase order that gave '90 days credit'. The buyer's stores signed goods receipt notes on delivery and raised no written objection. By May, the buyer had paid ₹6 lakh and stopped answering calls about the balance.

The credit period in the purchase order is more than 45 days, so the law cuts it down: payment fell due 45 days from delivery. Assume, only for the arithmetic, that three times the bank rate works out to 18% a year. Compounded monthly at 1.5%, interest on the ₹12 lakh balance over nine months is roughly ₹1.72 lakh. The unit files a reference on the ODR portal before the council covering Ghaziabad, attaching the purchase order, invoices, goods receipt notes, e-way bills, the ledger and the interest working.

At the first hearing, the buyer says two lots were defective. It has no rejection note and no email from the time, and it kept the panels. The Council suggests settlement; the buyer offers principal with half the interest, payable in two instalments, with the full claim reviving on default. The unit accepts, because a full award would likely be challenged under section 34 and take another year to collect. Different facts, for example a registration dated after the purchase order, would have changed this advice.

Challenging or enforcing a Facilitation Council award

A buyer who wants to set aside the award must file a petition under section 34 of the Arbitration and Conciliation Act within three months of receiving it, extendable by 30 days for sufficient cause, and must first deposit 75% of the awarded amount under section 19 of the MSMED Act. Courts have treated the deposit as mandatory, though they can allow it in instalments. The grounds are the narrow section 34 grounds: lack of jurisdiction, denial of a fair hearing, conflict with the fundamental policy of Indian law, patent illegality. A buyer cannot reargue the facts. Writ petitions against Council awards are generally not entertained when section 34 is available.

If the buyer neither pays nor challenges in time, the award is enforced as a decree under section 36. The supplier files an execution petition in the court with jurisdiction, asking for attachment of bank accounts, receivables or property. The new section 18A adds a faster route: recovery as arrears of land revenue through the Collector where the buyer's assets are located. For details on execution, see our post on enforcing an arbitral award as a decree.

Because the award amount is now treated as a debt under the IBC, an unpaid award against a company may also support an insolvency petition, subject to the IBC's minimum default threshold of ₹1 crore for companies. That is a serious step with consequences for every creditor, and it is not a collection tool for small amounts. Our post on section 9 petitions by operational creditors covers when it makes sense.

Council claim, commercial suit or IBC: which route fits?

A rough comparison for an unpaid supplier. Most suppliers who qualify start with the Council.

PointMSE Facilitation CouncilCommercial suitIBC section 9
Who can use itRegistered micro or small supplierAny creditor; claim of ₹3 lakh or more in a commercial courtOperational creditor with a default of ₹1 crore or more against a company
Court feeNo ad valorem court feeAd valorem court fee on the claimPrescribed filing fee
InterestStatutory: three times bank rate, compounded monthlyAs per contract or as the court allowsClaim filed with the resolution professional
Pre-litigation stepNone compulsoryPre-institution mediation under section 12A unless urgent relief is soughtDemand notice under section 8
Buyer's arbitration clauseOverriddenCourt will refer the dispute to arbitration if asked under section 8Not a bar, but a pre-existing dispute is
ChallengeSection 34 with 75% depositAppeal under the Commercial Courts ActAppeal to the NCLAT

The commercial suit route is explained in our post on pre-institution mediation in commercial suits, and the courts themselves on our commercial courts in Delhi page.

If you are the buyer: limiting your exposure

Buyers who receive a Council notice should first check whether the claimant is really a supplier: the Udyam category, the date of registration against the contract dates, and the nature of the supply. If the objection is good, raise it at the start and in writing. Then reconcile the account honestly. Councils lose patience with buyers who dispute invoices their own ERP shows as received.

Going forward, a buyer can reduce exposure by recording quality objections in writing within 15 days of delivery, paying MSE invoices within 45 days, and disclosing MSE dues in its accounts as section 22 requires. Companies with MSE dues outstanding beyond 45 days also file the half-yearly MSME Form I return with the Registrar of Companies.

Tax adds another reason to pay on time. Since 2023 the income tax law has allowed a buyer to deduct sums owed to micro and small suppliers only in the year of actual payment if they are paid beyond the section 15 deadline. That rule began as section 43B(h) of the Income-tax Act 1961; check the corresponding provision of the Income-tax Act 2025 with your chartered accountant. And interest paid under section 16 is never deductible, under section 23 of the MSMED Act.

What to do this week if a buyer owes you money

  • Download your Udyam certificate and note the category and registration date.
  • List every unpaid invoice with its delivery date, due date and amount outstanding.
  • Collect proof of delivery and acceptance for each invoice: GRNs, challans, e-way bills, emails.
  • Pull the buyer's ledger, bank receipts, TDS certificates and any debit notes.
  • Check whether any invoice is close to three years old, and look for written acknowledgments.
  • Send a written demand listing principal and statutory interest, and ask the buyer to put any dispute in writing.
  • Prepare the interest working invoice by invoice, month by month.
  • Decide between the Council, a commercial suit and other routes before limitation becomes an issue.

Before you file

Most Council claims are won or lost on paper prepared before the reference is filed: the registration dates, the proof of acceptance and a clean interest calculation. When Advocate B.K. Singh looks at a supplier's file, the first thing he lines up is the Udyam registration date against the purchase order dates, because that decides whether the buyer's strongest objection is available at all. Everything else follows from the account.

If you would like an advocate to read your purchase orders and invoices and tell you whether the Council route is open, the team of Advocate B.K. Singh at B.K. Singh & Associates can review the papers and explain the options. You can write to us through the online enquiry form, and for agreements that will avoid these disputes next time, see our page on commercial contracts and agreements.

Frequently asked questions

Can a medium enterprise file a claim before the MSME Facilitation Council?

No. Chapter V of the MSMED Act protects only a 'supplier', defined as a micro or small enterprise that has filed its memorandum. A medium enterprise has to use a commercial suit, arbitration under the contract or, where the amount is large enough, the IBC.

Is Udyam registration compulsory to file an MSME delayed payment case?

Registration is now voluntary for general purposes after the 2026 amendment, but the Council remedy is available only to a registered supplier. Under Silpi and Mahakali, registration should predate the contract; that view is under reference to a larger bench after NBCC v State of West Bengal (2025).

Can the buyer and supplier agree on 60 or 90 days' credit?

They can agree on a shorter period, but a written agreement cannot extend the payment period beyond 45 days from acceptance under section 15. A 90-day credit term is read down to 45 days for the purpose of interest.

What is the MSME interest rate on delayed payments?

Compound interest with monthly rests at three times the bank rate notified by the Reserve Bank of India. The bank rate changes with RBI policy, so the claim should apply the rate in force for each period.

Where do I file if the buyer is in another state?

Before the Facilitation Council that has jurisdiction over your place of business. After the 2026 amendment, jurisdiction follows the supplier's address recorded in its registration, so a Noida supplier can proceed against a buyer in Mumbai or Chennai from its own council.

Do I need a lawyer to file on the MSME ODR portal?

No, the portal allows suppliers to file themselves. Many do the first stage alone and bring in an advocate when the matter goes to arbitration, a counter-claim is filed, or the buyer raises registration or limitation objections.

How long does a Facilitation Council case take?

The 2026 amendment sets targets: 90 days for the settlement stage, 30 days to move to arbitration, and 90 days from completion of pleadings for the award. Actual time depends on the Council's workload and on how the buyer contests the claim.

Can the buyer file a counter-claim before the Council?

Yes. The buyer can claim liquidated damages, the cost of rejected goods or other amounts arising from the same contract, and the Council can decide the counter-claim in the arbitration.

Does the buyer's arbitration clause stop the Council from deciding the case?

No. The Supreme Court held in Mahakali Foods that section 18 overrides an arbitration agreement between the parties, and that the Council can arbitrate even after attempting conciliation.

Can an MSME claim GST and TDS amounts before the Council?

The claim is for the amount due under the invoices, which normally includes GST charged. TDS deducted and deposited by the buyer is credited to the buyer's account, so show it as received and attach the TDS certificates.

What if the buyer is a government department or PSU?

Government buyers are covered like any other buyer. Central public sector enterprises are also required to settle MSE invoices through TReDS platforms, and a Council claim can be filed if they do not pay on time.

Can I go to the Council and also file a civil suit for the same invoices?

You should not run both for the same claim, as the buyer will object and courts discourage parallel proceedings. Choose one route after weighing registration, limitation, interest and how the buyer is likely to contest.

Advocate B.K. Singh

Written and reviewed at B.K. Singh & Associates

Advocate B.K. Singh

Founder of B.K. Singh & Associates. MCA, LL.B., LL.M., with more than twenty years of practice before the Supreme Court, the Delhi High Court, district courts and tribunals across Delhi NCR. This article explains the general law as of 24 October 2026; it is not legal advice on your facts.

Talk to an advocate about your matter

Share the notice, order or a short note of what happened. We will tell you the deadline and the next step.

Send an enquiry Call +91 96259 61599
WhatsApp us